Some more photo's from today:
Here are the two landing gear door valances that we completed on June 5th. More pics of those later once I can get them off of the shelf.
Here is one of the gear doors which is almost done, we just have to install a bearing where part of the landing gear attaches to it, and finish the blind fasteners on the bottom skins once we finally get our order, one of the other gear doors is at the same spot as this one in the amount of work left:
The third gear door is getting close to being done as well, just a few more rows of regular rivets to shoot and then on to finishing off with the blind fasteners and installing the bearing.
Finally the last door, we've just began shooting the outside skins on. We're waiting on more material (should arrive in the next day or two) to finish of two more skins we need, then we can finish buttoning this one up as well.
We still have two more skins to finish on the top side of the wingtip (again waiting for material). In the meantime we started shooting some of the bottom skins.
Lastly, today we started the skin removal on both vertical stabilizers. Most of that should be done by tomorrow or Wednesday then we can start replacing what needs to be replaced. From what we can see so far the structure looks to be a absolutely great shape which is good news!
(Lots of little reinforcing strips randomly installed on this one when we opened it up)
I think that's about it for now, more to come later!