I stopped by Dave's work area a while ago and here is a shot of the finished master and slave for what I think he said was the mixture control on the Testiclese test stand.
Dave is busy sorting parts and tools to go to Addison to help maintain the B-24A at its new base there.
Below, Dave is pulling tools from the main tool chests to go into a smaller one that he will be driving to Addison in a few days.
Below is a shot of the fuel filters and pump discussed previously.
All the old wiring from the control cab is being replaced. This is the panel right behind the engine.
This is part of the wiring for the main power for the test stand.
Below is the main console in the cab with the new wiring harness being installed.
Below is a view of the cab. If I understand Dave correctly, the panel on the left will come out as not being needed. The boxes on the floor contain an engine/ignition analyzer I was told.
A view of the business end of the test stand showing new oil and fuel lines and fittings installed.
Another view of the test end showing the oil coolers mounted below the engine and also the oil drip pan assembly that can be retracted as needed, I think.
The engine shown is one of FIFI's old R-3350-57 which will basically be used to test the functioning of the test stand. Work on the new hybrid R-3350 engines continues and Dave said he was taking some parts including additional cowling parts to Ezell Aviation on his way to Addison to continue the reworking of the different exhaust manifold and other changes needed to fit the original nacelles.
Hopefully I've provided correct info on all this but if not, Dave is free to correct or add to this when he gets a bit of free time.
Randy