I haven't been able to update my web page:
http://www.B-17FlyingFortress.info
and the MarengoMetalWorks guys are concentrating on their
quarter scale metal P-51 R/C:
http://www.marengometalworks.com
but I can tell you this about the B-17E:
Work is progressing on the rear fuselage between STA 6 and STA7.
The XC-108 cargo door frame was removed late last year, and
the left waist window has been added. The right waist window's
sliding tracks are in. Working on making the left side tracks.
We're putting the beams in for the gun mounts.
Crushed ribs have been replaced. The skin between STA 6 and STA7
has been replaced, except for the belly, as we have not taken the
cargo floor out yet (we need something to stand on).
Next up is BLK 3 and BLK 7, putting the nose back on, and
refurbing the cockpit. Oh yeah, the dorsal fin repairs are
somewhere in this timeline, too.
Sounds so easy, doesn't it?
If anyone has a spare Million $$$, please PM me.
Last edited by
DryMartini on Thu Jun 23, 2005 3:45 pm, edited 1 time in total.