T-6G / Hoisting complete A/C / Thread-size hoisting ring??

Posted: Sun Nov 25, 2012 11:23 am
by chrisB
Hello everybody,
we are going to overhaul a T-6G in Germany and I hope you can help me out with some infos...

The A/C is some hundred miles away right now and not that easy to access, we need to disassemble it for road transport to germany. Therefore we are building some hoisting equipment. Does anyone know the thread-size of the hoisting ring, that will be screwed in the wing middle section? (E-700 in the second picture)

Thank you in advance!

Chris

Image

Image

Re: T-6G / Hoisting complete A/C / Thread-size hoisting ring

Posted: Sun Nov 25, 2012 3:57 pm
by 51fixer
The E-700 Lifting Eye has-
5/8"-18NF-3 Threads from the bottom to 5/8" up the shaft.
1/8" of transition from 5/8-18 threaded dia to 3/4" dia.
3/4" to 1 9/16" up the shaft the dia is 3/4"
Starting at the 1 9/16" point there is a flange about 1 1/8" dia by 1/8" tall and then a ring 1/2' thick with an OD of 1 3/4" and an ID of 3/4".
Above that is a large loop made from 1/2" dia bar 1 1/8"radius on the OD, 7/8"radius on the ID for the top and bottom circles of the loop with overall length of 4 1/4" top to bottom of the loop. The loop is made in 2 pcs and welded together installed in the eye of the threaded eyebolt discussed above.

Good luck.

We have lifted using a strap under the upper engine mounts where it attaches to the firewall.
Look down this page-
viewtopic.php?f=3&t=21830&start=1230

Re: T-6G / Hoisting complete A/C / Thread-size hoisting ring

Posted: Sun Nov 25, 2012 7:48 pm
by Tiger moth
Lance aircraft had the lifting rings when I bought mine.

Re: T-6G / Hoisting complete A/C / Thread-size hoisting ring

Posted: Mon Nov 26, 2012 8:10 am
by chrisB
51fixer and Tiger moth, thank you very much for the helpful information!

Re: T-6G / Hoisting complete A/C / Thread-size hoisting ring

Posted: Thu Nov 29, 2012 3:51 am
by C.6-60
Hello Chris B.

I came up with another part number for the lifting eyes.

The Erection & Maintenance Handbook T.O. 1T-6C-2 revised 30 Nov 1956

Figure 41 - Loose Equiptment - shows Item 10 Hoist Fittings

Part Number 36-55009

I hope this helps you if you are trying to order them.

Vincent

Re: T-6G / Hoisting complete A/C / Thread-size hoisting ring

Posted: Fri Dec 21, 2012 8:44 am
by chrisB
for everybody else interested in the hoisting rings, see the pic below (rings bought from Lance)

Image

Re: T-6G / Hoisting complete A/C / Thread-size hoisting ring

Posted: Fri Dec 21, 2012 8:51 am
by chrisB
And regarding the transport of the A/C to Germany, the link and pics of "51fixer" were very helpful, we also did not use the hoisting rings and instead used slings around the engine mount.

Image
Road transport on the "autobahn"

Image
Unloading, it just started to snow